Worked

 

The Worked concept is present throughout VISUAL PLANNING. It is used as an “overlay” on the schedule grid.

This is used by events, by period types including those applied to calendars.

USE

 

The type of period worked

A type of period worked is used to position worked events or calendars.

It is also possible the define the value of a coefficient for each period worked. This coefficient will be used in valuation items.

Worked Event

A Worked Event can only be positioned within a worked time period.

In the majority of cases, events must be worked.