Structure of Visual Planning

Lost? Visit our sitemap

Control column Heading

 

This is a dimension or form type of heading.

A Control column heading is used to perform a calculation:

  • for each resource of a dimension or for each event containing the form,
    • for events corresponding to a filter (only in the case of a dimension),
  • for a finite period (only in the case of the dimension).

This calculation can concern:

  • either the number of events,
  • or the duration,
  • or the load,
  • or certain numerical values in the form,
  • or certain valuation items,
  • or certain resource values.

A control column can be persistent or not.

Warning

In the case of the form, the calculation is performed on all the child events of a parent. The calculation result will then be visible in the parent event’s Control column heading.

Print Friendly, PDF & Email
1 Etoile2 Etoiles3 Etoiles4 Etoiles5 Etoiles (No vote)
Loading...
Consulting training

Need training?

Use our consulting services!